Discover high-quality outdoor products from leading brands and support sustainable use with us.

Helsport Gimle Family 4+ - stormproof bad weather family tent for 4-6 people

Mietprodukt

€26,95 /Tag

UVP: €1.119,00

Tax included Shipping calculated at checkout.
Size
  • Apple Pay
  • EPS
  • Google Pay
  • Klarna
  • Maestro
  • Mastercard
  • PayPal
  • Shop Pay
  • Visa

Free shipping for orders over EUR 99

In Germany we deliver free shipping for orders over 99 EUR! Up to an order value of EUR 99, shipping costs are EUR 5.95.

The return shipping is always free!

Different shipping cost regulations apply to other countries.

Renting for longer is worth it - up to 28% discount

You will receive the following discounts on your rental price:

Minimum rental period: 3 days

From 7 days rental period - 7% discount
From 14 days rental period - 14% discount
From 21 days rental period - 21% discount
From 28 days rental period - 28% discount

A safe feeling for you!

Your rental products will arrive on time 1-3 days before the first day of rental. Return shipping is free for you!

All products are cleaned with an ecological detergent after each process and checked for damage.

If you have any questions - we will advise you - at any time.

Free cancellation

You can cancel your rental booking up to 5 days before the start of the rental (first rental day) and we will refund the entire invoice amount.

purchase option

If you particularly like rental products, you can also buy them from us at a reduced price.
Please feel free to contact us about this. You will definitely receive an attractive price since you have already rented the products.

How we calculate your purchase price:
We take into account the condition of the product and the rental payment you have already made, so that you receive an attractive price for the product. You can keep the product directly and pay us the purchase price.

Click here to make a purchase request

Care instructions for the rental products

We clean every product ecologically and gently after each rental so that it is in perfect condition for the next rental.

So that future adventurers can also have fun with outdoor equipment, we would like to ask for your support:

  • Please only pack dry products in the box for return shipping
  • Please only remove coarse dirt such as sand
  • do not use chemical cleaners or brushes. If you want to remove stains, do it with water.
  • no product should be put in the dryer or washing machine

Rent your outdoor equipment - The Helsport Gimle Family 4+ family tent

Are you planning an outdoor adventure with your family or friends? Then the Helsport Gimle Family 4+ tent is the perfect choice for you! With enough space for 4-6 people and a spacious 180 cm vestibule, this tent offers comfort and convenience for your camping adventures. And best of all, you can easily rent it from us to make your outdoor experience unforgettable.

Maximum comfort for your family

The Helsport Gimle Family 4+ tent is the epitome of comfort and convenience. With enough space for 4-6 people, it offers the ideal accommodation for your camping trips. Whether in the forest or at the campsite, this tent will make your adventure unforgettable.

The spacious vestibule of the Gimle Family 4+ tent (yes, you heard right, you can rent it! ) is 180 cm high and offers not only space for your equipment, but also additional living space. Here you can sit comfortably together and enjoy nature.

Organize yourself with ease

Inside the tent you will find practical inner pockets that will help you organize your utensils properly. No more annoying searching for your pocket knife or flashlight! Everything has its place in the Gimle Family 4+ tent.

Optimal ventilation and temperature control

The Helsport Gimle Family 4+ tent is not only spacious, but also cleverly designed. With the Helsport AirFlow II® ventilation system, a mosquito net and a window for ventilation, you will always stay at the optimal temperature. So you can enjoy nature to the fullest without having to worry about condensation or heat.

Optional inner tent for more privacy

With an optional inner tent, you can create a separate sleeping cabin for 2 people in the Gimle Family 4+ tent. This gives you and your fellow travelers more privacy and comfort.

Technical product features and highlights

  • Helsport AirFlow II® ventilation: For fresh air and less condensation.
  • Assembly time: less than 10 minutes
  • Specially designed pole mount: Color-coded poles and pole channels for easy setup.
  • Unique pole system: wind stability and minimal vibrations in windy conditions.
  • Attachment points for guy ropes: No more tangling.
  • Two windows made of cold-resistant plastic: view to the outside and resistance to cold.
  • Inside pockets for easy organization: no more chaotic searching.
  • Space for up to 6 people: ideal for families or groups.

Technical data:

  • Outer tent water column: 3000 mm
  • Soil water column: 5000 mm
  • Total weight: 7.8 kg
  • Weight (inner tent): 1.54 kg
  • Weight (outer tent): 3.85 kg
  • Persons: 6
  • Number of inputs: 1
  • Tent porch: 1
  • Pegs included: 24
  • Weight of tent poles: 2003 g
  • Length of the rod segments: 48 cm
  • Bar bend: 13 mm
  • Weight of tent pegs: 21 g
  • Season: All year round

Rent your outdoor equipment and experience adventure

Immerse yourself in the world of the Gimle Family 4+ tent and experience unforgettable adventures with your family and friends! Whether in summer or winter, this tent is the perfect companion for your outdoor discoveries. So what are you waiting for? Rent your outdoor equipment now from Eddy's Adventure and start your next adventure!

About Eddy's

We have the right equipment, be it weekend camping alone or with the kids, bikepacking, hiking, packrafting, a day hike or a multi-day trekking/backpacking tour.